365 Data Centers

13873 Park Center Road, Ste 75

Herndon, VA

IAD4

COLOCATION

About IAD4 Data Center

OVERVIEW


365 Data Centers operates this facility located at 13873 Park Center Road, Ste 75 in Herndon. The 326,000 SF retrofit facility is designed to meet customer colocation needs. Infrastructure redundancies include N+1 for cooling and N+1/2N for UPS.

2Q22 Northern Virginia Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    326000 SF
  • Year Built
    1985
  • Building Floors
    6
  • Building Owner
    BECO Management
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (3) PoPs Services
  • Cox Communications
    83 Fiber
  • Verizon Business
    172 Fiber
  • Zayo
    903 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    Two (2) active power 270 kW flywheel-based UPS systems
  • Generator Redundancy
    N+1
  • Generator Description
    Onsite 800 kW Caterpillar generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Cooling capacity of 80 tons; nine (9) Liebert CRAC units with hot aisle containment available

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM 365 Data Centers IAD4 FACILITY

Tell us a little about your needs before we connect you with a 365 Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to 365 Data Centers.

SEND QUOTE

GET A QUOTE