x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

3z Canada

151 Front Street West

Toronto, ON

YYZ01

COLOCATION

About YYZ01 Data Center

OVERVIEW


This data center serves the Toronto market and is operated by 3z Canada. The data center was retrofit and is currently sized at 325,772 SF, including non-critical space.

4Q22 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    325772 SF
  • Year Built
    1954
  • Building Floors
    --
  • Building Owner
    Allied Data Centres
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (9) PoPs Services
  • Beanfield
    23 Fiber
  • Cogent
    645 Fiber
  • Gtt
    147 Fiber
  • Hibernia Networks
    92 Fiber
  • Level 3
    745 Fiber
  • Megaport
    106 Fiber
  • Teliasonera
    9 Fiber
  • Wolfe
    69 Fiber
  • Zayo
    915 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    --
  • Generator Redundancy
    --
  • Cooling Redundancy
    --

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM 3z Canada YYZ01 FACILITY

Tell us a little about your needs before we connect you with a 3z Canada representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to 3z Canada.

SEND QUOTE

GET A QUOTE