Ace Data Centers

1950 S 950 East

Provo, UT

COLOCATION

About Ace Data Centers Data Center

OVERVIEW


Ace Data Centers operates this facility located at 1950 S 950 East in Provo. This facility is purpose built and currently offers 850 kW of critical power to data center customers. Backup generators are configured as N+1.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    44794 SF
  • Year Built
    1996
  • Building Floors
    2
  • Building Owner
    Ace Data Centers
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    (6) 750 kW UPS w/ additional UPS added if needed; 120 UPS battery time at peak load (minutes)
  • Generator Redundancy
    N+1
  • Generator Description
    (3) 2 MW generators (3,500-gallon fuel storage each); priority 24/7 refueling contracts; additional generator installation space allocated for install when needed
  • Cooling Redundancy
    N+2
  • Cooling Description
    Fully segregated hot and cold aisles; colocation floor cooled by (12) 60-ton and (1) 30 Liebert CRAC units; data center uses 100% outside air majority of the year

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Ace Data Centers FACILITY

Tell us a little about your needs before we connect you with a Ace Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Ace Data Centers.

SEND QUOTE

GET A QUOTE