x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Allied Data Centres

250 Front Street West

Toronto, ON

COLOCATION

About Allied Data Centres Data Center

OVERVIEW


This data center serves the Toronto market and is operated by Allied Data Centres. The data center is a 1,400,000 SF purpose built facility. Connectivity to AWS Direct Connect is available for customer use. The facility also offers N+1 generator redundancy and 2N cooling redundancy.

4Q22 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.120 - 0.130
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    1400000 SF
  • Year Built
    1988
  • Building Floors
    13
  • Building Owner
    Canadian Broadcasting Centre
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (9) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • Generator Redundancy
    N+1
  • Generator Description
    4 Caterpillar diesel generators on site, 2,500 kW of capacity each
  • Cooling Redundancy
    2N
  • Cooling Description
    Water cooled mechanical system

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Allied Data Centres FACILITY

Tell us a little about your needs before we connect you with a Allied Data Centres representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Allied Data Centres.

SEND QUOTE

GET A QUOTE