250 Front Street West
Toronto, ON M5V 3G6
COLOCATION

GET A QUOTE
SAVE
Allied Data Centres
250 Front Street West
Toronto, ON
COLOCATION
About Allied Data Centres Data Center
OVERVIEW
This data center serves the Toronto market and is operated by Allied Data Centres. The data center is a 1,400,000 SF purpose built facility. Connectivity to AWS Direct Connect is available for customer use. The facility also offers N+1 generator redundancy and 2N cooling redundancy.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.120 - 0.130
-
Single or Dual FeedDual Feed
-
On-Site SubstationNo
-
Power Provider--
-
Number of SubstationsTwo
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size1400000 SF
-
Year Built1988
-
Building Floors13
-
Building OwnerCanadian Broadcasting Centre
-
Purpose Built or RetrofitPurpose Built
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AWS Direct Connect199 Cloud
-
Amazon Web Services27 Fiber
-
Bell Canada56 Fiber
-
Cogeco Cable33 Fiber
-
Level 3 (Lumen Technologies)968 Fiber
-
Lightower219 Fiber
-
Rogers Communications43 Fiber
-
TELUS Communications59 Fiber
-
beanfield Metroconnect19 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS Redundancy2N
-
Generator RedundancyN+1
-
Generator Description4 Caterpillar diesel generators on site, 2,500 kW of capacity each
-
Cooling Redundancy2N
-
Cooling DescriptionWater cooled mechanical system
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 45 facilities near 250 Front Street West in Toronto, Ontario.
BACK TO PROFILE
REQUEST A QUOTE FROM Allied Data Centres FACILITY
Tell us a little about your needs before we connect you with a Allied Data Centres representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss