Ascent Data Centers

17 Vondrau Drive

Cambridge, ON

TOR1

COLOCATION

About TOR1 Data Center

OVERVIEW


Ascent Data Centers's TOR1 facility is located at 17 Vondrau Drive in the Toronto market. The building comes in at 267,000 in total SF and currently offers 5,150 kW of critical power. Ascent Data Centers offers customers connectivity options such as Rogers Communications, Telia Sonera and Zayo at this location. To ensure continuity of service, the facility maintains N+1 generator redundancy.

4Q22 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.090 - 0.100
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    267000 SF
  • Year Built
    --
  • Building Floors
    1
  • Building Owner
    Ascent
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (5) PoPs Services
  • Bell Canada
    56 Fiber
  • Rogers Communications
    43 Fiber
  • TELUS Communications
    59 Fiber
  • Telia Sonera
    172 Fiber
  • Zayo
    915 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    Distributed redundant UPS configurations
  • Generator Redundancy
    N+1
  • Cooling Redundancy
    N+1
  • Cooling Description
    Customized air handlers to utilize outside air economization; facility offers free cooling 90% of the year

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Ascent Data Centers TOR1 FACILITY

Tell us a little about your needs before we connect you with a Ascent Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Ascent Data Centers.

SEND QUOTE

GET A QUOTE