x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Cologix

151 Front Street West

Toronto, ON

TOR1

COLOCATION

About TOR1 Data Center

OVERVIEW


Cologix operates this data center located at 151 Front Street West in the Toronto market. The 325,772 SF retrofit facility is designed to meet customer colocation needs. The UPS systems are N/2N redundant and the generators are 2N redundant.

4Q22 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    One
  • Estimated kW/Cabinet
    15.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    325772 SF
  • Year Built
    1954
  • Building Floors
    8
  • Building Owner
    Allied Data Centres
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (14) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N/2N
  • UPS Description
    N(single UPS and single generator) or 2N (redundant UPS and generator) configurations
  • Generator Redundancy
    2N
  • Generator Description
    Diesel generator 24-hours at full load
  • Cooling Redundancy
    N+1
  • Cooling Description
    3,000 tons of cooling capacity; Ultrasonic humidification; Redundant, onsite backup chillers; Chilled water loop connected to energy efficient Enwave Deep Lake Water Cooling system; APC hot aisle containment pods

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Cologix TOR1 FACILITY

Tell us a little about your needs before we connect you with a Cologix representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Cologix.

SEND QUOTE

GET A QUOTE