x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

CoreSite

12343 Sunrise Valley Drive

Reston, VA

VA4

COLOCATION

About VA4 Data Center

OVERVIEW


CoreSite is under construction with a new data center. The data center was purpose built and is currently sized at 289,000 SF, including non-critical space. Customers have a range of connectivity options at the facility to fiber providers like China Unicom, NantWorks and China Telecom. The facility is designed to provide on-site connections to China Unicom, NantWorks and China Telecom upon construction.

4Q22 Northern Virginia Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.060 - 0.070
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    Dominion Virginia Power
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
  • Building Size
    289000 SF
  • Year Built
    --
  • Building Floors
    --
  • Building Owner
    CoreSite
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Planned
  • On-Site Conf Room
    Planned
  • On-Site Break Room
    Planned

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (44) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    --
  • UPS Description
    TBD based on development
  • Generator Redundancy
    --
  • Generator Description
    TBD based on development
  • Cooling Redundancy
    --
  • Cooling Description
    TBD based on development

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CoreSite VA4 FACILITY

Tell us a little about your needs before we connect you with a CoreSite representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CoreSite.

SEND QUOTE

GET A QUOTE