x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

CoreSite

650 South Grand Avenue, Suites 600/1000

Los Angeles, CA

COLOCATION

About CoreSite Data Center

OVERVIEW


This facility is operated by CoreSite and is located in the Los Angeles data center market. This facility is retrofit and currently offers 1,220 kW of critical power to data center customers. Customers have a range of connectivity options at the facility to fiber providers like AT&T, Global Crossing and British Telecom. To ensure continuity of service, the facility maintains N+1 generator redundancy.

4Q22 Los Angeles Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    66623 SF
  • Year Built
    1926
  • Building Floors
    13
  • Building Owner
    Gene Elmore
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (15) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    AC 120V/240V; 480V 3 phase available; DC - 48 Volts with 6 hour battery backup
  • Generator Redundancy
    N+1
  • Generator Description
    6-2000 KW generators; 20,000 gallons of diesel fuel = 72 hours at full load
  • Cooling Redundancy
    N+1
  • Cooling Description
    Redundant 225 ton Liebert A/C units

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CoreSite FACILITY

Tell us a little about your needs before we connect you with a CoreSite representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CoreSite.

SEND QUOTE

GET A QUOTE