About DFW1 Data Center
OVERVIEW
DFW1 is a colocation data center in Carrollton operated by CyrusOne. The data center is a 670,000 SF retrofit facility. Carriers such as tw telecom, Time Warner Cable and Alpheus are connected to the data center in addition to IBM Cloud, Megaport and PacketFabric cloud services. Infrastructure redundancies include N+1 for cooling and N/2N for UPS.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.060 - 0.070
-
Single or Dual FeedDual Feed
-
On-Site SubstationNo
-
Power ProviderOncor
-
Number of SubstationsTwo
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size670000 SF
-
Year Built2000
-
Building Floors2
-
Building OwnerCyrusOne
-
Purpose Built or RetrofitRetrofit
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T715 Fiber
-
AboveNet137 Fiber
-
Alpheus69 Fiber
-
Atlantic Broadband201 Fiber
-
Cogent Communications762 Fiber
-
Grande44 Fiber
-
IBM Cloud76 Cloud
-
Level 3 (Lumen Technologies)972 Fiber
-
Megaport340 Cloud
-
PacketFabric183 Cloud
-
Time Warner Cable155 Fiber
-
Zayo916 Fiber
-
tw telecom114 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN/2N
-
UPS Description750 kVA Mitsubishi UPS systems; each power leg has a dedicated UPS with battery backup
-
Generator Redundancy2N
-
Generator DescriptionScalable 2.25 MW Detroit Diesel dedicated generators pre-wired for additional capacity; 6,000 gallon belly tank per generator
-
Cooling RedundancyN+1
-
Cooling DescriptionHybrid indirect evaporative cooling system capable of offering 80% free cooling; highly-efficient multiple 500-ton Direct Evaporative Cooling Units with rapid restart and adaptive controlled microprocessors (with ability to scale as density increases); backup water tanks with 48-hour capacity at a full load
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 82 facilities near 1649 W Frankford Road in Carrollton, TEXAS.
BACK TO PROFILE
REQUEST A QUOTE FROM CyrusOne DFW1 FACILITY
Tell us a little about your needs before we connect you with a CyrusOne representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss