Raleigh-Durham I
2223 NE Creek Parkway
Durham, NC 27713
COLOCATION

GET A QUOTE
SAVE
CyrusOne
2223 NE Creek Parkway
Durham, NC
Raleigh-Durham I
COLOCATION
About Raleigh-Durham I Data Center
OVERVIEW
CyrusOne operates this data center in Durham, located at 2223 NE Creek Parkway. This facility is purpose built and currently offers 14,250 kW of critical power to data center customers. Raleigh-Durham I currently offers fiber connectivity to Time Warner Cable, Level 3 (Lumen Technologies) and AT&T. Raleigh-Durham I's cooling infrastructure offers N+2 redundancy.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.040 - 0.050
-
Single or Dual FeedDual Feed
-
On-Site SubstationYes
-
Power ProviderDuke Energy
-
Number of SubstationsTwo
-
Estimated kW/Cabinet200.00
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size420000 SF
-
Year Built2013
-
Building Floors1
-
Building OwnerCyrusOne
-
Purpose Built or RetrofitPurpose Built
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T713 Fiber
-
CenturyLink730 Fiber
-
Level 3 (Lumen Technologies)968 Fiber
-
Time Warner Cable157 Fiber
-
Time Warner Telecom208 Fiber
-
XO Communications487 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN+2
-
UPS Description1.2 MW UPS modules (Toshiba/Mitsubishi); 24 x Static Transfer Switch's with Reserve Duel Module UPS's total redundancy at 1.5 MW on every Emergency Busway
-
Generator RedundancyN+2
-
Generator DescriptionSix (6) 2,800 kW prime-rated (3,000 kW standby rated) Caterpillar C-175 engine generators; two (2) remote 20,000-gallon tanks with minimum 48-hour capacity
-
Cooling RedundancyN+2
-
Cooling DescriptionHighly efficient N+2 redundant Trane chillers with rapid restart and adaptive controlled microprocessors (with ability to scale as density increases)
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 6 facilities near 2223 NE Creek Parkway in Durham, NORTH CAROLINA.
BACK TO PROFILE
REQUEST A QUOTE FROM CyrusOne Raleigh-Durham I FACILITY
Tell us a little about your needs before we connect you with a CyrusOne representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss