Convergence Building 5
2501 S State Highway
Lewisville, TX 75067
COLOCATION

GET A QUOTE
SAVE
CyrusOne
2501 S State Highway
Lewisville, TX
Convergence Building 5
COLOCATION
About Convergence Building 5 Data Center
OVERVIEW
This CyrusOne facility is positioned at 2501 S State Highway in Lewisville. The building comes in at 84,000 in total SF and currently offers 4,500 kW of critical power. Connectivity options at the facility include Zayo, Atlantic Broadband and Level 3 (Lumen Technologies), with cloud connectivity to PacketFabric and Megaport. Convergence Building 5's cooling infrastructure offers N+1 redundancy.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.060 - 0.060
-
Single or Dual FeedDual
-
On-Site SubstationYes
-
Power ProviderNew Mexico Power & Light
-
Number of SubstationsOne
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size84000 SF
-
Year Built1979
-
Building Floors1
-
Building OwnerDigital Realty
-
Purpose Built or RetrofitRetrofit
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T714 Fiber
-
AboveNet136 Fiber
-
Alpheus69 Fiber
-
Atlantic Broadband201 Fiber
-
Grande44 Fiber
-
Level 3 (Lumen Technologies)971 Fiber
-
Megaport340 Cloud
-
PacketFabric183 Cloud
-
Time Warner Cable155 Fiber
-
Zayo915 Fiber
-
tw telecom114 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS Redundancy2N
-
UPS DescriptionMultiple MGE 8000 625 kVA UPS systems
-
Generator Redundancy2N
-
Generator DescriptionMultiple 2.25 MW Detroit Diesel generators; 3300 belly tank each plus an added 6,000 gallon external tank for every two generators
-
Cooling RedundancyN+1
-
Cooling DescriptionHighly efficient multiple 500 ton Trane chillers with fast restart and adaptive controlled microprocessors; Chilled water loops
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 58 facilities near 2501 S State Highway in Lewisville, TEXAS.
BACK TO PROFILE
REQUEST A QUOTE FROM CyrusOne Convergence Building 5 FACILITY
Tell us a little about your needs before we connect you with a CyrusOne representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss