x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

CyrusOne

7100 Metropolis Drive

Austin, TX

Austin III

COLOCATION

About Austin III Data Center

OVERVIEW


Austin III is a colocation data center in Austin operated by CyrusOne. The 172,000 SF building has delivered 6,000 kW to the market, with an additional 12,000 kW master-planned. CyrusOne offers customers connectivity options such as Zayo, Windstream Wholesale and Alpheus at this location.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    172000 SF
  • Year Built
    2015
  • Building Floors
    1
  • Building Owner
    CyrusOne
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (11) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Multiple Mitsubishi 750 kVA/750 kW UPS systems; each power leg has two dedicated UPS systems with VRLA battery backup
  • Generator Redundancy
    --
  • Generator Description
    Scalable 2.25 MW MTU generators dedicated to each power leg; 48-hour belly tank with each generator at full-load (longer run times at partial load)
  • Cooling Redundancy
    --
  • Cooling Description
    Highly efficient multiple 500-ton Trane chillers with rapid restart and adaptive controlled microprocessors (ability to scale as density increases); closed loop chilled water cooling design

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CyrusOne Austin III FACILITY

Tell us a little about your needs before we connect you with a CyrusOne representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CyrusOne.

SEND QUOTE

GET A QUOTE