About CIN6 Data Center

OVERVIEW


CyrusOne operates this data center located at 7200 Industrial Road in the Cincinnati market. This facility is retrofit and currently offers 9,000 kW of critical power to data center customers. CIN6 currently offers fiber connectivity to Zayo, Atlantic Broadband and AT&T. On the infrastructure side, the data center offers N+1 UPS redundancy and N+1 cooling.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.070
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    143000 SF
  • Year Built
    1998
  • Building Floors
    1
  • Building Owner
    CyrusOne
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    --
  • On-Site Conf Room
    --
  • On-Site Break Room
    --

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (10) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    Four (4) x 750kVA and Six (6) x 1000kVA UPS systems; each power system has a dedicated UPS with battery backup
  • Generator Redundancy
    N+1
  • Generator Description
    Five (5) x 1.5kW diesel generators; Two (2) x 2.0 diesel generators and One (1) x 1.75kW generator; 550-gallon dedicated day tank for each generator; Two (2) x 8000-gallon and Two (2) x 10,000-gallon capacity
  • Cooling Redundancy
    N+1
  • Cooling Description
    Open-loop chilled water cooling; Two (2) x efficient 1000-ton carrier water cooled centrifugal chillers; Seven (7) x 250- ton air- cooled chillers; One (1) x 500-ton carrier air cooled-chillers

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CyrusOne CIN6 FACILITY

Tell us a little about your needs before we connect you with a CyrusOne representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CyrusOne.

SEND QUOTE

GET A QUOTE