About Florence Data Center

OVERVIEW


This CyrusOne facility is positioned at 7200 Industrial Road in Florence. Designed to deliver 140,000 total SF, CyrusOne has currently commissioned 9,000 kW at the retrofit facility. Customers have a range of connectivity options at the facility to fiber providers like Level 3 (Lumen Technologies), Grande and Time Warner Cable. To ensure continuity of service, the facility maintains N+1 generator redundancy.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.070
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    140000 SF
  • Year Built
    1998
  • Building Floors
    1
  • Building Owner
    CyrusOne
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    --
  • On-Site Conf Room
    --
  • On-Site Break Room
    --

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (9) PoPs Services
  • AT&T
    641 Fiber
  • AboveNet
    141 Fiber
  • Alpheus
    69 Fiber
  • Atlantic Broadband
    209 Fiber
  • Grande
    44 Fiber
  • Level 3 (Lumen Technologies)
    886 Fiber
  • Time Warner Cable
    152 Fiber
  • Zayo
    845 Fiber
  • tw telecom
    117 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • Generator Redundancy
    N+1
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CyrusOne Florence FACILITY

Tell us a little about your needs before we connect you with a CyrusOne representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CyrusOne.

SEND QUOTE

GET A QUOTE