x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

CyrusOne

800 Cottontail Lane

Somerset, NJ

Somerset I

COLOCATION

About Somerset I Data Center

OVERVIEW


CyrusOne operates this facility in the Northern New Jersey data center market. The combined total of leased and available IT capacity at the facility is 11,000 kW. Carrier options at the data center include Lightower, Cross River Fiber and Lightpath. On the infrastructure side, the facility offers N+2 redundancy for UPS, N+2 for cooling, and N+2 for generators.

4Q22 Northern New Jersey Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.060 - 0.100
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    Public Service Electric and Gas Co.
  • Number of Substations
    One
  • Estimated kW/Cabinet
    5.00 - 15.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    212522 SF
  • Year Built
    2011
  • Building Floors
    2
  • Building Owner
    CyrusOne
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (13) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+2
  • Generator Redundancy
    N+2
  • Generator Description
    Multiple 2,600 kW prime-rated (3,000 kW standby rated); Caterpillar C-175 engine generators; on-site diesel fuel storage capacity in excess of industry standards
  • Cooling Redundancy
    N+2
  • Cooling Description
    700-ton Trane chillers with rapid restart and adaptive controlled microprocessors (with ability to scale as load increases)

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CyrusOne Somerset I FACILITY

Tell us a little about your needs before we connect you with a CyrusOne representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CyrusOne.

SEND QUOTE

GET A QUOTE