About San Antonio I Data Center

OVERVIEW


CyrusOne operates this data center at 9999 Westover Hills Boulevard in San Antonio. The data center is a 95,530 SF retrofit facility. CyrusOne offers customers connectivity options such as Time Warner Cable, Alpheus and AboveNet at this location. San Antonio I's cooling infrastructure offers N+1 redundancy.

4Q22 San Antonio Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.060 - 0.060
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    CPS Energy
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    95530 SF
  • Year Built
    1996
  • Building Floors
    2
  • Building Owner
    CyrusOne
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (15) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N/2N
  • Generator Redundancy
    2N
  • Generator Description
    Multiple 2.25 MW Detroit Diesel generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Highly efficient multiple 500 ton Trane chillers with fast restart and adaptive controlled microprocessors

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CyrusOne San Antonio I FACILITY

Tell us a little about your needs before we connect you with a CyrusOne representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CyrusOne.

SEND QUOTE

GET A QUOTE