EWR2-C,D
1919 Park Avenue, Floor 2
Weehawken , NJ 07086
COLOCATION

GET A QUOTE
SAVE
Cyxtera Technologies
1919 Park Avenue, Floor 2
Weehawken , NJ
EWR2-C,D
COLOCATION
About EWR2-C,D Data Center
OVERVIEW
Cyxtera Technologies operates this data center in Weehawken , located at 1919 Park Avenue, Floor 2. The 432,259 SF building has delivered 6,300 kW to the market, with an additional 6,000 kW master-planned. Those colocated at the facility have the ability to connect directly to cloud service platforms like Megaport, and can access fiber lines from companies like Lightpath, Lightower and CFN Services. To ensure continuity of service, the facility maintains N+1 generator redundancy.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.100 - 0.100
-
Single or Dual FeedDual Feed
-
On-Site SubstationYes
-
Power ProviderPSE&G
-
Number of SubstationsMore
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size432259 SF
-
Year Built1987
-
Building Floors5
-
Building OwnerHartz Mountain
-
Purpose Built or RetrofitPurpose Built
-
On-Site Office SpaceNo
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T714 Fiber
-
AboveNet136 Fiber
-
Anova Technologies2 Fiber
-
CFN Services8 Fiber
-
CenturyLink732 Fiber
-
Cogent Communications760 Fiber
-
Comcast375 Fiber
-
Crown Castle96 Fiber
-
Hibernia Atlantic60 Fiber
-
Hudson Fiber75 Fiber
-
Level 3 (Lumen Technologies)971 Fiber
-
Lightower217 Fiber
-
Lightpath42 Fiber
-
Megaport106 Fiber
-
Megaport340 Cloud
-
NexGen Networks25 Fiber
-
Perseus Telecom6 Fiber
-
Reliance Globalcom35 Fiber
-
Sidera T-Systems55 Fiber
-
Spread Networks12 Fiber
-
Time Warner Telecom209 Fiber
-
Verizon Communications545 Fiber
-
XO Communications485 Fiber
-
Zayo915 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN+1
-
UPS DescriptionUPS type for 2nd floor: MGE EPS 700 + MGE EPS 6555 (4x); UPS type for 5th floor: 9x PX Symetra
-
Generator RedundancyN+1
-
Generator DescriptionThree (3) 2 MW generators and four (4) 2.5 MW generators (one of the 2.5 MW gens is a swing gen); 48-hour diesel fuel runtime at full load, 72 hours at current load
-
Cooling RedundancyN+1
-
Cooling DescriptionCooling capacity for 2nd floor -- 2,000 tons; cooling capacity for 5th floor -- 1050 tons; temperature ranges between 59-90 degrees Fahrenheit; hot/cold aisle containment
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 52 facilities near 1919 Park Avenue, Floor 2 in Weehawken , NEW JERSEY.
BACK TO PROFILE
REQUEST A QUOTE FROM Cyxtera Technologies EWR2-C,D FACILITY
Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss