x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Cyxtera Technologies

1919 Park Avenue, Floor 2

Weehawken , NJ

EWR2-C,D

COLOCATION

About EWR2-C,D Data Center

OVERVIEW


Cyxtera Technologies operates this data center in Weehawken , located at 1919 Park Avenue, Floor 2. The 432,259 SF building has delivered 6,300 kW to the market, with an additional 6,000 kW master-planned. Those colocated at the facility have the ability to connect directly to cloud service platforms like Megaport, and can access fiber lines from companies like Lightpath, Lightower and CFN Services. To ensure continuity of service, the facility maintains N+1 generator redundancy.

4Q22 Northern New Jersey Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.100 - 0.100
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    PSE&G
  • Number of Substations
    More
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    432259 SF
  • Year Built
    1987
  • Building Floors
    5
  • Building Owner
    Hartz Mountain
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    No
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (24) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    UPS type for 2nd floor: MGE EPS 700 + MGE EPS 6555 (4x); UPS type for 5th floor: 9x PX Symetra
  • Generator Redundancy
    N+1
  • Generator Description
    Three (3) 2 MW generators and four (4) 2.5 MW generators (one of the 2.5 MW gens is a swing gen); 48-hour diesel fuel runtime at full load, 72 hours at current load
  • Cooling Redundancy
    N+1
  • Cooling Description
    Cooling capacity for 2nd floor -- 2,000 tons; cooling capacity for 5th floor -- 1050 tons; temperature ranges between 59-90 degrees Fahrenheit; hot/cold aisle containment

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Cyxtera Technologies EWR2-C,D FACILITY

Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Cyxtera Technologies.

SEND QUOTE

GET A QUOTE