SFO1-B
2403 Walsh Avenue
Santa Clara, CA 95051
COLOCATION

GET A QUOTE
SAVE
Cyxtera Technologies
2403 Walsh Avenue
Santa Clara, CA
SFO1-B
COLOCATION
About SFO1-B Data Center
OVERVIEW
This Cyxtera Technologies facility is positioned at 2403 Walsh Avenue in Santa Clara. Designed to deliver 103,940 total SF, Cyxtera Technologies has currently commissioned 6,000 kW at the retrofit facility. Comcast, Megaport and XO Communications are some of the fiber options available at SFO1-B. On the infrastructure side, the facility offers N+1 redundancy for UPS, N+1 for cooling, and N+1 for generators.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.100 - 0.100
-
Single or Dual FeedDual Feed
-
On-Site SubstationNo
-
Power ProviderSilicon Valley Power
-
Number of SubstationsMore
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size103940 SF
-
Year Built1973
-
Building Floors2
-
Building OwnerDigital Realty
-
Purpose Built or RetrofitRetrofit
-
On-Site Office SpaceNo
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T713 Fiber
-
AboveNet138 Fiber
-
CenturyLink730 Fiber
-
Cogent Communications759 Fiber
-
Comcast418 Fiber
-
Level 3 (Lumen Technologies)968 Fiber
-
Megaport100 Fiber
-
Megaport340 Cloud
-
Silicon Valley Power18 Fiber
-
Time Warner Telecom208 Fiber
-
Verizon Communications544 Fiber
-
Zayo913 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN+1
-
UPS DescriptionUPS type: Batteries
-
Generator RedundancyN+1
-
Generator DescriptionFour (4) 2 MW generators and two (2) 1.5 MW generators; 48-hour diesel fuel runtime at full load, 7 days at current load
-
Cooling RedundancyN+1
-
Cooling Description1,530 tons cooling capacity; temperature ranges between 59-90 degrees Fahrenheit; hot/cold aisle containment
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 103 facilities near 2403 Walsh Avenue in Santa Clara, CALIFORNIA.
BACK TO PROFILE
REQUEST A QUOTE FROM Cyxtera Technologies SFO1-B FACILITY
Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss