x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Cyxtera Technologies

2425 Busse Road

Elk Grove Village, IL

ORD2-A,B

COLOCATION

About ORD2-A,B Data Center

OVERVIEW


Cyxtera Technologies operates this facility in the Chicago data center market. The building comes in at 163,747 in total SF and currently offers 12,800 kW of critical power. ORD2-A,B currently offers fiber connectivity to Level 3 (Lumen Technologies), Lightower and CenturyLink. On the infrastructure side, the data center offers N+1 UPS redundancy and N+1 cooling.

2Q21 Chicago Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.070
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Commonwealth Edison
  • Number of Substations
    More
  • Estimated kW/Cabinet
    --
  • Additional Information
    Roof access requires landlord permission

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    163747 SF
  • Year Built
    2000
  • Building Floors
    2
  • Building Owner
    --
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (18) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    UPS Type: Dual Conversion Static
  • Generator Redundancy
    N+1
  • Generator Description
    Twelve (12) 2 MW generators in legacy; three (3) 2.25 MW generators in addition; three (3) days diesel fuel runtime at full load, five (5) days at current load
  • Cooling Redundancy
    N+1
  • Cooling Description
    4,080 tons cooling capacity; temperature ranges from 59-90 degrees Fahrenheit; hot/cold aisle containment

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Cyxtera Technologies ORD2-A,B FACILITY

Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Cyxtera Technologies.

SEND QUOTE

GET A QUOTE