EWR3-B
365 S Randolphville Road
Piscataway, NJ 08854
COLOCATION

GET A QUOTE
SAVE
Cyxtera Technologies
365 S Randolphville Road
Piscataway, NJ
EWR3-B
COLOCATION
About EWR3-B Data Center
OVERVIEW
EWR3-B is a facility operated by Cyxtera Technologies in the Northern New Jersey market. The 351,000 SF retrofit facility provides colocation services to a variety of customers. Cyxtera Technologies offers customers connectivity options such as Lightpath, AT&T and Level 3 (Lumen Technologies) at this location. The facility offers N+1 UPS and N+1 generator redundancies.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.100 - 0.100
-
Single or Dual FeedDual Feed
-
On-Site SubstationYes
-
Power ProviderPSE&G
-
Number of SubstationsMore
-
Estimated kW/Cabinet--
-
Additional Information69kV Substation On Site
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size351000 SF
-
Year Built1974
-
Building Floors1
-
Building OwnerDigital Realty
-
Purpose Built or RetrofitRetrofit
-
On-Site Office SpaceNo
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T714 Fiber
-
AboveNet136 Fiber
-
CenturyLink732 Fiber
-
Cogent Communications760 Fiber
-
Cross River Fiber20 Fiber
-
Crown Castle96 Fiber
-
Hudson Fiber75 Fiber
-
Level 3 (Lumen Technologies)971 Fiber
-
Lightower217 Fiber
-
Lightpath42 Fiber
-
NexGen Networks25 Fiber
-
RCN54 Fiber
-
Sidera T-Systems55 Fiber
-
Sunesys128 Fiber
-
Verizon Communications545 Fiber
-
XO Communications485 Fiber
-
Zayo915 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN+1
-
UPS DescriptionUPS type: MGE; 3.6 MW UPS capacity
-
Generator RedundancyN+1
-
Generator DescriptionThree (3) 2 MW generators; 48-hour diesel fuel runtime at full load, 90+ hours at current load
-
Cooling RedundancyN+1
-
Cooling Description1,050 tons cooling capacity; temperature ranges between 59-90 degrees Fahrenheit; hot/cold aisle configuration
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 20 facilities near 365 S Randolphville Road in Piscataway, NEW JERSEY.
BACK TO PROFILE
REQUEST A QUOTE FROM Cyxtera Technologies EWR3-B FACILITY
Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss