DEN2-A
8534 Concord Center Drive
Englewood, CO 80112
COLOCATION

GET A QUOTE
SAVE
Cyxtera Technologies
8534 Concord Center Drive
Englewood, CO
DEN2-A
COLOCATION
About DEN2-A Data Center
OVERVIEW
Cyxtera Technologies operates this data center at 8534 Concord Center Drive in Englewood. The data center was purpose built and is currently sized at 85,660 SF, including non-critical space. Customers have a range of connectivity options at the facility to fiber providers like Cogent Communications, CenturyLink and Neutral Tandem. Backup generators are configured as N+1.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.080 - 0.080
-
Single or Dual FeedSingle Feed
-
On-Site SubstationNo
-
Power ProviderXcel Energy
-
Number of SubstationsOne
-
Estimated kW/Cabinet--
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size85660 SF
-
Year Built2000
-
Building Floors2
-
Building OwnerMapletree Investments
-
Purpose Built or RetrofitPurpose Built
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
AT&T715 Fiber
-
CenturyLink732 Fiber
-
Cogent Communications762 Fiber
-
Comcast376 Fiber
-
Level 3 (Lumen Technologies)972 Fiber
-
Neutral Tandem15 Fiber
-
Suddenlink18 Fiber
-
Time Warner Telecom210 Fiber
-
Verizon Communications546 Fiber
-
XO Communications485 Fiber
-
Zayo456 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS Redundancy2N
-
UPS DescriptionUPS type: Eaton Powerware 9315 - nine (9) 400 kW and five (5) 450 kW; distributed redundant UPS configuration
-
Generator RedundancyN+1
-
Generator DescriptionFour (4) 2 MW generators derated to 1.76 MW for altitude; 48-72 hours diesel fuel runtime at full load, 3-5 days at current load
-
Cooling RedundancyN+1
-
Cooling Description1,500 tons cooling capacity; four (4) 500-ton EVAPCO fluid coolers; temperature ranges from 59-90 degrees Fahrenheit; hot/cold aisle containment
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 27 facilities near 8534 Concord Center Drive in Englewood, COLORADO.
BACK TO PROFILE
REQUEST A QUOTE FROM Cyxtera Technologies DEN2-A FACILITY
Tell us a little about your needs before we connect you with a Cyxtera Technologies representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss