x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Digital Realty

2121 S Price Road

Chandler, AZ

COLOCATION

About Digital Realty Data Center

OVERVIEW


Operated by Digital Realty, this Chandler facility is located at 2121 S Price Road. Designed to deliver 519,479 total SF, Digital Realty has currently commissioned 34,200 kW at the purpose built facility. Connectivity options at the facility include Verizon Communications, AT&T and Internap, with cloud connectivity to Console Connect. The UPS systems are N+1/2N redundant and the generators are N+1 redundant.

4Q22 Phoenix Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.080
  • Single or Dual Feed
    Single
  • On-Site Substation
    Yes
  • Power Provider
    Salt River Project (SRP)
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    519479 SF
  • Year Built
    2001
  • Building Floors
    2
  • Building Owner
    Digital Realty
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    --

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (15) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    Four (4) 1250 kW Hitec CPS UPS systems
  • Generator Redundancy
    N+1
  • Generator Description
    Hitec CPS Modules with MTU Engines provide 2.0 MW each; 16 backup generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Three (3) Water-cooled chilled water producton plants producing 6,600 tons of chilled water; on-site water treatment and 180,000 gallon water storage system

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Digital Realty FACILITY

Tell us a little about your needs before we connect you with a Digital Realty representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Digital Realty.

SEND QUOTE

GET A QUOTE