x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Digital Realty

3 St. Anne’s Boulevard

3 Foxboro Park

COLOCATION

About 3 Foxboro Park Data Center

OVERVIEW


3 Foxboro Park is a colocation data center in Redhill operated by Digital Realty. The building comes in at 96,025 in total SF and currently offers 7,120 kW of critical power. Zayo, BT Global Services and Colt Technology Services are some of the fiber options available at 3 Foxboro Park. On the infrastructure side, the data center offers 2N UPS redundancy and N+1 cooling.

4Q22 London Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    96025 SF
  • Year Built
    2001
  • Building Floors
    2
  • Building Owner
    Digital Realty
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (5) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Ten UPS plants each with (2) 800kVA UPS modules setup in a 2N configuration
  • Generator Redundancy
    N+1
  • Generator Description
    Multiple diesel generators in a N+1 configuration
  • Cooling Redundancy
    N+1
  • Cooling Description
    Dedicated chilled water system to customer environment. Dedicated critical environment controls including air handling units and BMS system. Humidity regulation via rooftop air handling units.

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Digital Realty 3 Foxboro Park FACILITY

Tell us a little about your needs before we connect you with a Digital Realty representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Digital Realty.

SEND QUOTE

GET A QUOTE