About Building G Data Center
OVERVIEW
Digital Realty's Building G data center is located at 43940 Digital Loudoun Plaza in Ashburn. The 392,800 SF purpose built facility is designed to meet customer colocation needs. Customers have a range of connectivity options at the facility to fiber providers like Sidera T-Systems, XO Communications and Verizon Communications. Backup generators are configured as N+1.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.060 - 0.070
-
Single or Dual FeedDual Feed
-
On-Site SubstationYes
-
Power ProviderDominion Virginia
-
Number of SubstationsTwo
-
Estimated kW/Cabinet--
-
Additional Information• Powered by on-site dual-fed 150 MW dedicated power substation 230kV:34.5kV
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size392800 SF
-
Year Built2014
-
Building Floors2
-
Building OwnerDigital Realty
-
Purpose Built or RetrofitPurpose Built
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
Atlantic Broadband201 Fiber
-
CenturyLink730 Fiber
-
Cogent Communications759 Fiber
-
Comcast - Baltimore and D.C.1 Network
-
Criteo USA4 Network
-
Level 3 (Lumen Technologies)968 Fiber
-
Nutanix3 Network
-
PacketFabric183 Cloud
-
Sidera T-Systems57 Fiber
-
Symantec (NoAM)8 Network
-
Verizon Communications544 Fiber
-
XO Communications487 Fiber
-
Zayo913 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS Redundancy2N
-
UPS Description25,650 (kW) UPS Power Capacity
-
Generator RedundancyN+1
-
Generator Description60,000 (kW) Generator Power Capacity
-
Cooling RedundancyN+2
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 146 facilities near 43940 Digital Loudoun Plaza in Ashburn, VIRGINIA.
BACK TO PROFILE
REQUEST A QUOTE FROM Digital Realty Building G FACILITY
Tell us a little about your needs before we connect you with a Digital Realty representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss