x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

EdgeCore

21191 Atlantic Boulevard

Sterling, VA

COLOCATION

About EdgeCore Data Center

OVERVIEW


EdgeCore is under construction with a new data center in Sterling. The building offers a total of 720,000 SF. Backup generators in the building will feature N/N+1/2N redundancy. Infrastructure redundancies include N/N+1/2N for cooling and N/N+1/2N for UPS.

3Q22 Northern Virginia Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    Dominion Energy
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
  • Building Size
    720000 SF
  • Year Built
    --
  • Building Floors
    --
  • Building Owner
    EdgeCore
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    N/N+1/2N
  • UPS Description
    N, N+1, and 2N configurations with lithium-ion batteries
  • Generator Redundancy
    N/N+1/2N
  • Generator Description
    Generators provide 48 hours of run-time at full capacity
  • Cooling Redundancy
    N/N+1/2N
  • Cooling Description
    Air-cooled chillers with economization

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM EdgeCore FACILITY

Tell us a little about your needs before we connect you with a EdgeCore representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to EdgeCore.

SEND QUOTE

GET A QUOTE