x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Equinix

1895 Williams Parkway

Brampton, ON

TR7

COLOCATION

About TR7 Data Center

OVERVIEW


Equinix operates this data center at 1895 Williams Parkway in Brampton. The building comes in at 400,000 in total SF and currently offers 8,800 kW of critical power. Customers have a range of connectivity options at the facility to fiber providers like Rogers Communications, Zayo and Hydro One Telecom. To ensure continuity of service, the facility maintains N+1/2N generator redundancy.

2Q22 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.120 - 0.140
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    Brampton Hydro
  • Number of Substations
    One
  • Estimated kW/Cabinet
    5.00 - 5.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    400000 SF
  • Year Built
    2000
  • Building Floors
    1
  • Building Owner
    Equinix
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (7) PoPs Services
  • Bell Canada
    54 Fiber
  • Cogeco Cable
    31 Fiber
  • Hydro One Telecom
    10 Fiber
  • MTS Allstream
    27 Fiber
  • Rogers Communications
    41 Fiber
  • TELUS Communications
    58 Fiber
  • Zayo
    903 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Distributed redundant UPS configuration
  • Generator Redundancy
    N+1/2N
  • Generator Description
    B895— six (6) 2MW generators configured for N + 1; B896— three (3) 2MW generators configured for N + 1; 2N power sources at the cabinet; 100% availability for 1 source at any given time; branch circuit metering to the cabinet viewable by the customer via CP; B895— mixture of 24” x 36” and 24” x 42” cabinets with 2 x 208VAC/20A 3-phase PDUs
  • Cooling Redundancy
    N+1
  • Cooling Description
    DX split system AHU with airside economizer control configured as N+2

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Equinix TR7 FACILITY

Tell us a little about your needs before we connect you with a Equinix representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Equinix.

SEND QUOTE

GET A QUOTE