Equinix is planning to bring this data center online in the Frankfurt market. The retrofit facility offers customers access to office space, break rooms and conference rooms. Designs for the facility feature N+1 UPS redundancy. The facility also offers N generator redundancy and N+1 cooling redundancy.

4Q22 Frankfurt Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    0.80 - 2.40
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
  • Building Size
    --
  • Year Built
    --
  • Building Floors
    --
  • Building Owner
    --
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    Distributed redundant UPS configuration
  • Generator Redundancy
    N
  • Generator Description
    Four (4) 450kVA (405kW) diesel generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Centrifugal Chillers; renewable energy - 100% bundled in-country GoOs from hydro

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Equinix FR1 FACILITY

Tell us a little about your needs before we connect you with a Equinix representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Equinix.

SEND QUOTE

GET A QUOTE