eStruxture

431 Horner Avenue

Etobicoke, ON

TOR-3

COLOCATION

About TOR-3 Data Center

OVERVIEW


eStruxture operates this data center located at 431 Horner Avenue in the Toronto market. The retrofit facility offers customers access to office space, conference rooms and break rooms. Backup generators are configured as N+1.

1Q23 Toronto Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    Toronto Hydro
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    --
  • Year Built
    1980
  • Building Floors
    1
  • Building Owner
    --
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    No
  • On-Site Conf Room
    No
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (1) PoPs Services
  • Zayo
    456 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    Data hall 1 - APC Symmetra 80 kW and 250 kW; Data hall 2 - 450 kW Liebert 610; Data hall 3 - Liebert 675 kW NXL
  • Generator Redundancy
    N+1
  • Generator Description
    One (1) natural gas and two (2) diesel generators (2.5 MW diesel, 2.225 MW diesel, and 2MW natural gas); adequate fuel storage for minimum of 54 hours on full load, available natural gas generator to supplement & increase runtime if required
  • Cooling Redundancy
    N+1
  • Cooling Description
    Hot/cold containment available for individual high-density cabinets through heat removal door; data hall 1 & 2 with closed loop glycol CRAC units with individual dry coolers on the roof; data hall 3 with centralized chiller units with air handling units (also available with free cooling mode)

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM eStruxture TOR-3 FACILITY

Tell us a little about your needs before we connect you with a eStruxture representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to eStruxture.

SEND QUOTE

GET A QUOTE