x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Evoque Data Centers

15 Enterprise Avenue

Secaucus, NJ

NYC3

COLOCATION

About NYC3 Data Center

OVERVIEW


Evoque Data Centers's NYC3 data center is located at 15 Enterprise Avenue in Secaucus. The data center was retrofit and is currently sized at 154,691 SF, including non-critical space. Cloudflare, AboveNet and CableVision are some of the fiber options available at NYC3. NYC3's cooling infrastructure offers N+1 redundancy.

1Q23 Northern New Jersey Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    PSE&G
  • Number of Substations
    One
  • Estimated kW/Cabinet
    4.00 - 6.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    154691 SF
  • Year Built
    1967
  • Building Floors
    2
  • Building Owner
    Evoque
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (11) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Six (6) Liebert UPS systems, each with four (4) 600kW/750kVA modules
  • Generator Redundancy
    N+1
  • Generator Description
    Ten (10) 2,000 kW diesel generators; five (5) 10,000-gallon above-ground fuel tanks
  • Cooling Redundancy
    N+1
  • Cooling Description
    Five (5) 600-ton chillers/cooling towers with onsite make-up water

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Evoque Data Centers NYC3 FACILITY

Tell us a little about your needs before we connect you with a Evoque Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Evoque Data Centers.

SEND QUOTE

GET A QUOTE