About BOS1 Data Center

OVERVIEW


This data center serves the Boston market and is operated by Evoque Data Centers. This facility is purpose built and currently offers 7,200 kW of critical power to data center customers. Carrier options at the facility include Cogent Communications, Cloudflare and Crown Castle, with additional cloud services delivered by Megaport. Infrastructure in the data center includes 2N UPS and N+1 generator redundancies, with a cooling configuration of N+1.

4Q22 Boston Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    4.00 - 6.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    201590 SF
  • Year Built
    2002
  • Building Floors
    --
  • Building Owner
    --
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (11) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Four (4) UPS systems, each with four (4) 600kW/750kva modules
  • Generator Redundancy
    N+1
  • Generator Description
    Eight (8) 2,000 kW diesel generators; four (4) 20,000-gallon underground fuel tanks
  • Cooling Redundancy
    N+1
  • Cooling Description
    Five (5) 600-ton chillers/cooling tower with three (3) 1,600-gallon onsite make-up water tanks

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Evoque Data Centers BOS1 FACILITY

Tell us a little about your needs before we connect you with a Evoque Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Evoque Data Centers.

SEND QUOTE

GET A QUOTE