x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Green Mountain

Hainault Road and King George Cl, Southwest corner

Romford South

COLOCATION

About Romford South Data Center

OVERVIEW


Green Mountain has announced plans to bring additional capacity to the market with a new facility in Romford. The data center is expected to be sized at 161,459 SF and could have as much as 22,000 kW of critical power. The generators at the facility are designed to be N+1 redundant. Fiber connectivity options are set to include BT Global Services, KPN and Colt Technology Services.

1Q23 London Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    --
  • Number of Substations
    One
  • Estimated kW/Cabinet
    40.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    161459 SF
  • Year Built
    --
  • Building Floors
    --
  • Building Owner
    Green Mountain
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (4) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • Generator Redundancy
    N+1
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Green Mountain Romford South FACILITY

Tell us a little about your needs before we connect you with a Green Mountain representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Green Mountain.

SEND QUOTE

GET A QUOTE