x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

H5 Data Centers

5350 S. Valentia Way

Greenwood Village, CO

COLOCATION

About H5 Data Centers Data Center

OVERVIEW


H5 Data Centers operates this data center located at 5350 S. Valentia Way in the Denver market. The data center was retrofit and is currently sized at 300,000 SF, including non-critical space. Carrier options at the data center include Verizon Communications, Level 3 (Lumen Technologies) and Hurricane Electric. The UPS systems are 2N redundant and the generators are N+1 redundant.

1Q23 Denver Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.074 - 0.075
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Xcel Energy
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    3.00 - 15.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    300000 SF
  • Year Built
    1983
  • Building Floors
    2
  • Building Owner
    H5 Data Centers
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (12) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    17.5 MW gross utility feed
  • Generator Redundancy
    N+1
  • Generator Description
    17.5 MW from thirteen (13) diesel generators; two independent emergency generator lineups; multiple underground diesel fuel storage tanks
  • Cooling Redundancy
    N+1
  • Cooling Description
    3,540 tons total cooling capacity; facility utilizes a closed-coupled refrigerant-based mechanical system, creating active heat extraction at the rack level (allowing the most demanding rack densities to be cooled effectively)

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM H5 Data Centers FACILITY

Tell us a little about your needs before we connect you with a H5 Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to H5 Data Centers.

SEND QUOTE

GET A QUOTE