HostDime

1000 Wymore Road

Eatonville, FL

COLOCATION

About HostDime Data Center

OVERVIEW


HostDime has announced plans to bring additional capacity to the market with a new facility in Eatonville. At full build, the data center will offer 4,400 kW of critical power. The data center is designed for N+1 cooling redundancy to maintain temperature control. The data center is expected to give customers easy access to fiber providers including Zayo, Cogent Communications and Verizon Communications, among others.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    Duke Energy
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    88000 SF
  • Year Built
    2018
  • Building Floors
    7
  • Building Owner
    HostDime
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Planned
  • On-Site Conf Room
    Planned
  • On-Site Break Room
    Planned

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (8) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    A unique, three-tier electrical power design will allow the facility to sustain two consecutive system failures and still be operational
  • Generator Redundancy
    N+1
  • Generator Description
    Backup generators will contain enough reserve fuel to run one week at 80% load without any commercial power available
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM HostDime FACILITY

Tell us a little about your needs before we connect you with a HostDime representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to HostDime.

SEND QUOTE

GET A QUOTE