This iland facility is located at Unit 1, Powergate Business Park, Volt Ave in London. This retrofit facility measures 270,637 square feet in total. UPS systems are configured in 2N redundancy with N+1 generators and N+2 cooling.

1Q23 London Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    270637 SF
  • Year Built
    --
  • Building Floors
    --
  • Building Owner
    Equinix
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    --
  • On-Site Conf Room
    --
  • On-Site Break Room
    --

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    21,000 KW UPS capacity; 60 minutes UPS autonomy
  • Generator Redundancy
    N+1
  • Generator Description
    50 MVA generator capacity; 48 Hours of generator fuel at full load
  • Cooling Redundancy
    N+2
  • Cooling Description
    13×1100kWr Air-cooled package chillers giving 12,100kWr

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM iland FACILITY

Tell us a little about your needs before we connect you with a iland representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to iland.

SEND QUOTE

GET A QUOTE