x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Iron Mountain Data Centers

11560 Hayden Road

Manassas, VA

VA-4

COLOCATION

About VA-4 Data Center

OVERVIEW


Iron Mountain Data Centers has announced their intention to build a data center facility at 11560 Hayden Road. The data center will be housed inside a 165,000 SF building, while only a portion of that space will be utilized as raised floor for servers. The data center will feature N+1 UPS infrastructure. Iron Mountain Data Centers plans to allow client access to cloud services like Megaport at the facility.

3Q22 Northern Virginia Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.055 - 0.056
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Dominion Virginia Power
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    165000 SF
  • Year Built
    --
  • Building Floors
    1
  • Building Owner
    Iron Mountain
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (2) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • Generator Redundancy
    N+1
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Iron Mountain Data Centers VA-4 FACILITY

Tell us a little about your needs before we connect you with a Iron Mountain Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Iron Mountain Data Centers.

SEND QUOTE

GET A QUOTE