x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

OneNeck IT Solutions

8675 Concord Center Drive

Englewood, CO

COLOCATION

About OneNeck IT Solutions Data Center

OVERVIEW


OneNeck IT Solutions operates this data center located at 8675 Concord Center Drive in the Denver market. The building offers a total of 35,000 SF. OneNeck IT Solutions offers customers connectivity options such as TDS Telecom, CenturyLink and Comcast at this location. Infrastructure in the data center includes 2N UPS and N+1 generator redundancies, with a cooling configuration of N+1.

1Q23 Denver Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Xcel Energy
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    35000 SF
  • Year Built
    2015
  • Building Floors
    2
  • Building Owner
    OneNeck IT Solutions
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (5) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Two 2500 kVA Utility Transformers; dual A & B power to every cabinet
  • Generator Redundancy
    N+1
  • Generator Description
    Four 1.5MW Cummins Generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Each cabinet is directly vented while cool air is supplied to each aisle

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM OneNeck IT Solutions FACILITY

Tell us a little about your needs before we connect you with a OneNeck IT Solutions representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to OneNeck IT Solutions.

SEND QUOTE

GET A QUOTE