x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Prime Data Centers

2407 Ak Street

McClellan Park, CA

Sacramento One

COLOCATION

About Sacramento One Data Center

OVERVIEW


Unique tax incentives on former federal government owned base provides 30-40% savings on all IT & infrastructure investments. 38-acre campus with 1MM SF buildable GLA – multiple build-to-suit or powered shell. 50MVA privately owned substation expandable to 150MVA. Green, renewable power with 30-50% savings compared to the SF Bay Area. ~3ms latency to San Jose and San Francisco.

1Q23 Northern California Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    Sacramento Municipal Utility District
  • Number of Substations
    More
  • Estimated kW/Cabinet
    35.00
  • Additional Information
    Prime Data Centers owns an onsite 50MW critical substation. SMUD has three geographically diverse substation feeds to this location.

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    70000 SF
  • Year Built
    2018
  • Building Floors
    1
  • Building Owner
    Prime Data Centers
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (15) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N/N+1/2N
  • UPS Description
    VRLA Battery UPS
  • Generator Redundancy
    N+1
  • Generator Description
    9 MW backup power generation; 48 hours at full load; 5,000-gallon belly tank. Multiple four-hour fuel delivery contracts in place.
  • Cooling Redundancy
    N+1
  • Cooling Description
    1,935-ton cooling capacity; hot-aisle heat containment; pumped refrigerant economizer

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Prime Data Centers Sacramento One FACILITY

Tell us a little about your needs before we connect you with a Prime Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Prime Data Centers.

SEND QUOTE

GET A QUOTE