x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

QTS

159 Princeton Hightstown Road

East Windsor, NJ

COLOCATION

About QTS Data Center

OVERVIEW


This QTS facility is positioned at 159 Princeton Hightstown Road in East Windsor. This retrofit facility measures 553,930 square feet in total. On the infrastructure side, the data center offers 2N UPS redundancy and 2N cooling.

1Q23 Northern New Jersey Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.100 - 0.110
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    0.10 - 0.10
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    553930 SF
  • Year Built
    --
  • Building Floors
    2
  • Building Owner
    QTS
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (4) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    20 UPS units
  • Generator Redundancy
    N+1
  • Generator Description
    Six generators with 60,000 gallon fuel reserve
  • Cooling Redundancy
    2N
  • Cooling Description
    Five (5) air-cooled and four (4) water-cooled chillers

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM QTS FACILITY

Tell us a little about your needs before we connect you with a QTS representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to QTS.

SEND QUOTE

GET A QUOTE