x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Riverside Resources

5900 E Ben White Boulevard

Austin, TX

COLOCATION

About Riverside Resources Data Center

OVERVIEW


Riverside Resources operates this data center located at 5900 E Ben White Boulevard in the Austin market. Designed to deliver 219,777 total SF, Riverside Resources has currently commissioned 2,680 kW at the retrofit facility. On the interconnectivity side, the facility offers connections to on-net fiber providers including Alpheus, Verizon Communications and Windstream Communications. On the infrastructure side, the facility offers N+1 redundancy for UPS, N+1 for cooling, and N+1 for generators.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Austin Energy
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    219777 SF
  • Year Built
    1984
  • Building Floors
    2
  • Building Owner
    Riverside Resources
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (7) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    Three (3) 200 kW rotary UPS modules
  • Generator Redundancy
    N+1
  • Generator Description
    Four (4) existing generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Four (4) cooling towers; three (3) 800-1,000 ton chillers; in row coolers and downflow units available

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Riverside Resources FACILITY

Tell us a little about your needs before we connect you with a Riverside Resources representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Riverside Resources.

SEND QUOTE

GET A QUOTE