OVERVIEW


This data center serves the Quincy market and is operated by Sabey Data Centers. The data center is a 133,703 SF purpose built facility. Connectivity to Microsoft Azure ExpressRoute is available for customer use. UPS systems are configured in N+1 redundancy with N+1 generators and N+1 cooling.

4Q22 Quincy Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.020 - 0.030
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    Grant County PV
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    133703 SF
  • Year Built
    2015
  • Building Floors
    1
  • Building Owner
    Sabey Data Centers
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (5) PoPs Services
  • Centurylink
    625 Fiber
  • Comcast
    418 Fiber
  • Level 3
    745 Fiber
  • Microsoft Azure ExpressRoute
    139 Cloud
  • Zayo
    916 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    2 MW of critical power per module
  • Generator Redundancy
    N+1
  • Generator Description
    Generators with 72 hour run time at peak load
  • Cooling Redundancy
    N+1
  • Cooling Description
    • Leading energy-efficient HVAC technologies • Customizable for roof-top or side mounted units • Evaporative and economizer cooling lower energy costs 40 – 70%

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Sabey Data Centers Intergate.Quincy Building A FACILITY

Tell us a little about your needs before we connect you with a Sabey Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Sabey Data Centers.

SEND QUOTE

GET A QUOTE