About DRT-CHI1 Data Center

OVERVIEW


This facility is operated by ServerCentral Turing Group and is located in the Chicago data center market. The 1,133,739 SF retrofit facility provides colocation services to a variety of customers. Carrier options at the data center include Sprint, Zayo and US Signal. DRT-CHI1's cooling infrastructure offers N+1 redundancy.

1Q21 Chicago Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    ComEd
  • Number of Substations
    More
  • Estimated kW/Cabinet
    2.00 - 18.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    1133739 SF
  • Year Built
    1912
  • Building Floors
    8
  • Building Owner
    Digital Realty
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (23) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    70 MW UPS power capacity
  • Generator Redundancy
    N+2
  • Generator Description
    150 MW generator power capacity
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM ServerCentral Turing Group DRT-CHI1 FACILITY

Tell us a little about your needs before we connect you with a ServerCentral Turing Group representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to ServerCentral Turing Group.

SEND QUOTE

GET A QUOTE