x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

STACK Infrastructure

1441 Touhy Avenue

Elk Grove Village, IL

CHI01A

COLOCATION

About CHI01A Data Center

OVERVIEW


STACK Infrastructure operates this data center in Elk Grove Village, located at 1441 Touhy Avenue. Zayo, Time Warner Telecom and Comcast are some of the fiber options available at CHI01A. The UPS systems are N+1 redundant and the generators are N+1 redundant.

1Q23 Chicago Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.064 - 0.064
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Commonwealth Edison Co.
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    25.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    221000 SF
  • Year Built
    2015
  • Building Floors
    2
  • Building Owner
    STACK INFRASTRUCTURE
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (13) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • Generator Redundancy
    N+1
  • Generator Description
    5:1 reserve redundant 3.25 MW generators; fuel storage for minimum of 36 hours of operation
  • Cooling Redundancy
    N+1
  • Cooling Description
    Modular cooling system; free cooling; pumped refrigerant economization; no chilled water in facility

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM STACK Infrastructure CHI01A FACILITY

Tell us a little about your needs before we connect you with a STACK Infrastructure representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to STACK Infrastructure.

SEND QUOTE

GET A QUOTE