x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

STACK INFRASTRUCTURE

2001 Fortune Drive

San Jose, CA

SVY01

COLOCATION

About SVY01 Data Center

OVERVIEW


Launched in 2019, STACK INFRASTRUCTURE is a data center company branded and sponsored by investment company IPI Partners. Designed to meet the needs of both rapidly scaling enterprises and hyperscale companies, STACK offers an array of tailored infrastructure services to customers across the US. The company provides three data center solutions: HYPER STACK (hyperscale campuses and build-to-suit options), POWER STACK (powered shells), and READY STACK (readily available wholesale colocation and private suites). STACK’s current assets include nine data centers spanning seven US markets, with expansion sites located adjacent to six of those facilities.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.080 - 0.090
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Planned
  • Power Provider
    PG&E
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    25.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    140000 SF
  • Year Built
    --
  • Building Floors
    2
  • Building Owner
    STACK INFRASTRUCTURE
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (4) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    PUE cap at 1.3; if PUE is exceeded, provider will subsidize electricity costs for any overage incurred; multiple UPS systems.
  • Generator Redundancy
    N+1
  • Generator Description
    Eight (8) diesel generators totaling 17.5 MW; fuel storage for minimum 48 hours of operation
  • Cooling Redundancy
    N+1
  • Cooling Description
    Two independent chilled water plants with 7 chillers and 7 cooling towers (4,500 ton total capacity)

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM STACK INFRASTRUCTURE SVY01 FACILITY

Tell us a little about your needs before we connect you with a STACK INFRASTRUCTURE representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to STACK INFRASTRUCTURE.

SEND QUOTE

GET A QUOTE