x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

STACK INFRASTRUCTURE

Webb Bridge Road

Alpharetta, GA

ATL02

COLOCATION

About ATL02 Data Center

OVERVIEW


The HyperSTACK campus at Atlanta provides low-latency access to the southeast and DC markets, along with plenty of available fiber connectivity and an extremely favorable data center business climate. This 12MW campus sits on six acres, is carrier neutral, and is served by Georgia Power's proprietary Hi-Reli power system.

1Q21 Atlanta Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Georgia Power
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    150000 SF
  • Year Built
    --
  • Building Floors
    2
  • Building Owner
    STACK INFRASTRUCTURE
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Planned
  • On-Site Conf Room
    Planned
  • On-Site Break Room
    Planned

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    --
  • UPS Description
    TBD based on development
  • Generator Redundancy
    --
  • Generator Description
    TBD based on development
  • Cooling Redundancy
    --
  • Cooling Description
    TBD based on development

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM STACK INFRASTRUCTURE ATL02 FACILITY

Tell us a little about your needs before we connect you with a STACK INFRASTRUCTURE representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to STACK INFRASTRUCTURE.

SEND QUOTE

GET A QUOTE