x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Sungard Availability Services

1055 Spring Street

Atlanta, GA

ATL-1055

COLOCATION

About ATL-1055 Data Center

OVERVIEW


This Sungard Availability Services facility is located at 1055 Spring Street in Atlanta. The data center is a 35,300 SF retrofit facility. CenturyLink, Zayo and Time Warner Telecom are some of the fiber options available at ATL-1055. Infrastructure redundancies include N+1 for cooling and N+1 for UPS.

1Q23 Atlanta Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    Georgia Power
  • Number of Substations
    One
  • Estimated kW/Cabinet
    2.00 - 10.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    35300 SF
  • Year Built
    1999
  • Building Floors
    1
  • Building Owner
    Midtown - 1052 West Peachtree LLC
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (6) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    Four (4) redundant 500 kVA UPS banks (7 MW total capacity); One (1) 800kVA PW
  • Generator Redundancy
    N
  • Generator Description
    1,500 kVA Cummins Synergy generator with 4,000 gallon fuel tank, 1,600 kVA Baldor generator with 3,600 gallon fuel tank, 1,200 kVA CAT generator with 4,000 gallon fuel tank, two (2) 2,000 kVA Cummins Synergy generators with two (2) 4,000 gallon tanks
  • Cooling Redundancy
    N+1
  • Cooling Description
    Three (3) 150-ton chilled water towers, three (3) 100-ton chilled water towers in

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Sungard Availability Services ATL-1055 FACILITY

Tell us a little about your needs before we connect you with a Sungard Availability Services representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Sungard Availability Services.

SEND QUOTE

GET A QUOTE