x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Switch

6100 E Paris Ave SE

Grand Rapids, MI

PYRAMID Data Center

COLOCATION

About PYRAMID Data Center Data Center

OVERVIEW


The Pyramid Campus located in Grand Rapids, Michigan, is Switch’s iconic data center that will have a capacity of up to 1.8 million square feet of data center space and up to 110 MW of power upon completion. Switch’s Tier 5® Platinum facilities, combined with hyperscale purchasing power, makes Switch the highest-rated and most cost-effective colocation environment in the industry.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.067 - 0.068
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Consumers Energy
  • Number of Substations
    One
  • Estimated kW/Cabinet
    2.00 - 55.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    660000 SF
  • Year Built
    1989
  • Building Floors
    6
  • Building Owner
    Switch
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (14) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • Generator Redundancy
    2N
  • Cooling Redundancy
    2N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Switch PYRAMID Data Center FACILITY

Tell us a little about your needs before we connect you with a Switch representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Switch.

SEND QUOTE

GET A QUOTE