x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

T5 Data Centers

Janitell Road

Colorado Springs, CO

T5@Colorado Springs

COLOCATION

About T5@Colorado Springs Data Center

OVERVIEW


T5 Data Centers has announced plans to bring additional capacity to the market with a new facility in Colorado Springs. We expect the building to finish out at a total size of 912,000 SF and is planned to deliver 81,600 kW to the market. The data center will feature N+1/2N UPS infrastructure. The company aims for the data center to meet SOC 1, PCI and SSAE-16 standards.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.048 - 0.049
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Colorado Springs Utilities
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    912000 SF
  • Year Built
    --
  • Building Floors
    2
  • Building Owner
    T5 Data Centers
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (1) PoPs Services
  • Centurylink
    625 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • Generator Redundancy
    N+1
  • Cooling Redundancy
    N+1
  • Cooling Description
    Free cooling availability through 97% of the year; eco-friendly design practices; dual, independent water supply for commercial use; air-cooled chillers

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM T5 Data Centers T5@Colorado Springs FACILITY

Tell us a little about your needs before we connect you with a T5 Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to T5 Data Centers.

SEND QUOTE

GET A QUOTE