x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

TierPoint

14500 W. 105th Street

Lenexa, KS

LEN

COLOCATION

About LEN Data Center

OVERVIEW


TierPoint's LEN data center is located at 14500 W. 105th Street in Lenexa. The 58,000 SF retrofit facility is designed to meet customer colocation needs. Verizon Communications, Cogent Communications and Verizon Business are some of the fiber options available at LEN. On the infrastructure side, the facility offers N+1/2N redundancy for UPS, N+1 for cooling, and N+1 for generators.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    More
  • Estimated kW/Cabinet
    20.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    58000 SF
  • Year Built
    --
  • Building Floors
    1
  • Building Owner
    TierPoint
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (10) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    3 substations/4 MW each
  • Generator Redundancy
    N+1
  • Generator Description
    Two redundant 2,500kW CAT generators each with 4K gallons of fuel storage
  • Cooling Redundancy
    N+1
  • Cooling Description
    Continuous cooling with dual path water system

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM TierPoint LEN FACILITY

Tell us a little about your needs before we connect you with a TierPoint representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to TierPoint.

SEND QUOTE

GET A QUOTE