x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

365 Data Centers

11650 Great Oaks Way

Alpharetta, GA

ATL-11650

COLOCATION

About ATL-11650 Data Center

OVERVIEW


Operated by 365 Data Centers, this Alpharetta facility is located at 11650 Great Oaks Way. Designed to deliver 78,000 total SF, 365 Data Centers has currently commissioned 4,600 kW at the retrofit facility. Carrier options at the data center include Level 3 (Lumen Technologies), Zayo and Time Warner Telecom. Cooling systems are configured in N+1 redundancy.

1Q23 Atlanta Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.070
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Georgia Power
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    2.00 - 10.00
  • Additional Information
    (4) Independent loop fed utility power feeds

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    78000 SF
  • Year Built
    1999
  • Building Floors
    6
  • Building Owner
    Carter Validus
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (7) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Two (2) redundant 500 kVA UPS banks; Four (4) redundant 1500 kVA UPS banks (4.15 MW total capacity); Two (2) redundant 750 kVA banks
  • Generator Redundancy
    N+1
  • Generator Description
    1,500 kVA Cummins Synergy generator with 3,600 gallon fuel tank; 1250 kVA Baldor generator with 2,000 gallon fuel tank; 2,000 kVA Cummins Synergy generators 4,000 gallon tanks; Two (2) 2,000 kVA CAT generators with two (2) 4,0000 gallon tanks
  • Cooling Redundancy
    N+1

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM 365 Data Centers ATL-11650 FACILITY

Tell us a little about your needs before we connect you with a 365 Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to 365 Data Centers.

SEND QUOTE

GET A QUOTE