x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

CoreSite

2972 Stender Way

Santa Clara, CA

SV4

COLOCATION

About SV4 Data Center

OVERVIEW


CoreSite’s Silicon Valley data center, SV4, is located on the CoreSite Santa Clara campus along with SV3, SV5, SV6,? SV7 and SV8. The Santa Clara campus provides ideal infrastructure for high-density, compute-intensive requirements and access to a robust ecosystem of hundreds of cloud, network and IT providers. The campus is tethered via high-count dark-fiber to CoreSite’s data centers in?San Jose?and?Milpitas,, so that customers can easily establish interconnections within the CoreSite?Silicon Valley?customer ecosystem from any of our local data centers.

4Q22 Northern California Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.100 - 0.100
  • Single or Dual Feed
    --
  • On-Site Substation
    Yes
  • Power Provider
    Silicon Valley Power
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    104500 SF
  • Year Built
    2011
  • Building Floors
    2
  • Building Owner
    Coresite
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (31) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N/2N
  • UPS Description
    Mitsubishi systems
  • Generator Redundancy
    N+1
  • Generator Description
    24 hours of on-site fuel storage
  • Cooling Redundancy
    N+1
  • Cooling Description
    Self-contained rooftop AC units with integrated evaporative condensing units, air side economization, and variable speed fans for optimal under floor pressure control

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM CoreSite SV4 FACILITY

Tell us a little about your needs before we connect you with a CoreSite representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to CoreSite.

SEND QUOTE

GET A QUOTE